Posted on February 19, 2021February 27, 2021 by NickFusor V – June 2020 Long overdue post on the progress made on my fifth fusor buildout. Notable upgrades include a 6″ spherical chamber, 60kV 20mA supply, redesigned neutron oven, and borated HDPE and lead shadow-cone shield. Max Neutron DosePoisor @ 1/4 PowerInitial TestingSetup OverviewInitial Control SetupInitial Reactor SetupChamber Valve CouplingSide Grid AlignmentFront Grid AlignmentGrid MountingGrid & CouplingFeedthroughChamber Frame ConstructionChamber Frame LayoutChamber ConstructionFreeCAD Mockup No ViewportFreeCAD Mockup